Homogeneous Pipeline Joints

Bwer HDPE Butt Fusion Welding Fittings

High-Performance Fabricated & Molded PE100 Butt Fusion Fittings for Water, Gas, & Industrial Pipes. Certified globally for Iraq's infrastructure projects. Trusted by top ministries and Garmian utility contractors.

Diameter Range 63 - 1200 mm
SDR Classes SDR 11 / SDR 17
Material Purity 100% Virgin PE100
Manufacturing Std ISO 4427-3

The Bwer Advantage for HDPE Butt Fusion Welding Fittings

Discover why Bwer Pipes is recognized as the leading and most trusted manufacturer in Iraq.

Matched Physical Properties

Produced from the exact same raw PE100 resin as Bwer pipes, ensuring identical melting points and thermal properties during butt-welding.

Excellent Pressure Rating

Molded under extreme pressure to prevent internal void formations. Maintains full pipeline pressure ratings (up to PN25) without structural weakness.

Full Fittings Range

Available in 90/45 degree elbows, equal and reducing tees, concentric reducers, and stub ends for steel flange connections.

Highly Smooth Bore

Optimized radius profile prevents pressure drops and limits erosion wear at change-of-direction points.

Technical Specifications

Material Class 100% Virgin Polyethylene PE100
Standard EN 12201-3 / ISO 4427-3
PN Rating PN10, PN16, PN20, PN25
SDR Class SDR 17 / SDR 11
Thermal Reversion <= 3% at 110°C
Density 959 kg/m³
Elongation >= 600%

Step-by-Step Field Guidelines

1. Clean and Align

Secure the pipe and the fitting inside the butt-welding machine clamps. Clean welding faces.

2. Planing

Use the electric trimmer to plane joint faces until they are perfectly flat and parallel.

3. Heating

Apply the heating mirror (210°C to 230°C) to the joint faces. Wait for standard bead height.

4. Joining and Cooling

Remove the heater, join ends immediately, and apply welding pressure. Allow to cool under pressure.

Quality Control & Lab Testing

Manufactured in our state-of-the-art facility in Kalar, Garmian. Tested on every single batch.

Hydrostatic Pressure Test

Tests fitting assemblies under high pressures to ensure zero weld rupture.

Tensile Strength Test

Pulls welded joints to verify that rupture occurs outside the weld zone.

Carbon Black Content

Validates UV protection stability in molded components.

Dimensional Scan

Ensures exact tolerances for wall thickness and outer diameter.

Frequently Asked Questions

Common questions regarding implementation in Iraqi governorates.

Q: Are these fittings compatible with other brands of PE100 pipes?

A: Yes, they can be welded to any PE100 pipes made from raw materials certified to ISO 4427 standards.

Q: What is the difference between molded and fabricated fittings?

A: Molded fittings are injected in one piece in a factory (up to 630mm), while fabricated fittings are constructed by welding pipe sections (typically for very large sizes).

Q: Are stub-ends supplied with backing rings?

A: Yes, we supply steel or PP-coated steel backing rings to complete the flange connections.

Request Factory-Direct Price Quote

Connect with our commercial office in Garmian to coordinate volume orders, logistics timelines, and certifications for municipal bids.